TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
01.05.2023 Fredrik Bonäs/ Kenneth Engblom3 © Wärtsilä NOT YET CLASSIFIED
BEFORE: CONVENTIONAL LNG VALUE CHAIN
01.05.2023 Fredrik Bonäs/ Kenneth Engblom4 © Wärtsilä NOT YET CLASSIFIED
AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN
© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom5
WÄRTSILÄ LNG SOLUTIONSO
NSH
OR
EO
FFSH
OR
ELI
FEC
YCLE
Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering terminals
LNG storage & regasification barge
LNG regasification BOG reliquefaction Cargo Handling SystemGas and LNG Carriers
Fuel gas handling system Ship and Cargo Tank design
Lifecycle services Start–up support Product and technical support Spares
© Wärtsilä NOT YET CLASSIFIED
Wärtsilä offers products and services for modern, flexible and sustainable power generation and LNG infrastructure.
WÄRTSILÄ SERVICES
EPC SparesMaintenance Operation
Project Development and Financial Services
01.05.2023 Fredrik Bonäs/ Kenneth Engblom6
01.05.2023 Fredrik Bonäs/ Kenneth Engblom7 © Wärtsilä NOT YET CLASSIFIED
SHORTENING PROJECT DEVELOPMENTAND EPC LEAD TIME
YOU HAVE AN IDEA!
Wärtsilä route• Design, Engineering, Cost Evaluations,
Constructability reviews and Safety studies• Project execution and commissioning• Asset management and maintenance agreements
Conventional route• Choose an engineering company• Conceptual design, Feasibility studies and FEED• Evaluate potential contractors• Bidding process, supplier selection and delivery
contract(s)• Manage construction of LNG terminal and power
plant• Arrange for operation maintenance and training
Your shorter & quicker route to commercial operations!(10-20 months)
Long process to FID, more time spenton administration, legal consultations and contractual setup...(20-30 months)
© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom8
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom9
MINI/SMALL SCALE LIQUEFACTION PLANTS
INPUT OUTPUTPLANT
Gas sources
• Pipeline gas• Biogas• Landfill gas• Associated gas• Coal seam gas• Tight gas• Shale gas
2,000 – 300,000 TPA(3,400 – 510,000 GPD)Gas pre-treatmentLiquefaction• Mixed Refrigerant: 2,000 -
30,000 TPA(3,400 – 51,000 GPD)
• Reversed Brayton: 20,000 – 300,000 TPA(34,000 – 510,000 GPD)
Storage tanksJetty & Marine facilitiesExport systems
LNG transport• Carriers• Tanker trucks• Containers• Rail cars
Peak shavinggas send-out
Ship bunkering
TPA = Tonnes Per YearGPD = Gallons Per Day
© Wärtsilä NOT YET CLASSIFIED
Bergen, Norway
“Twice the capacity,half the footprint!”
Kollsnes IICustomer Gasnor
Type Small scale liquefaction plant
Tank net volume 4,000 m3
Capacity 230 TPD / 84,000 TPA
Size ofliquefaction unit
12 m x 38 m
Gas source Pipeline gas. Inlet pressure typically 70 bar.
Details Extension to Kollsnes I. Includes two truck loading stations and existing loading jetty for small LNG carriers.
Scopeof supply
Complete plant, incl.• Gas pre-treatment• Cooling system (Seawater)• Double Reversed Brayton
liquefaction process• Storage tank• Electrical and control
systems• Civil works
Delivery method EPCIC
Delivered 2007
01.05.2023 Fredrik Bonäs/ Kenneth Engblom10
© Wärtsilä NOT YET CLASSIFIED
Oslo, Norway
“135 Oslo region buses will be able to run on biogas which means 10,000 tonnes emission reduction per year.”
EGE BiogasCustomer Cambi AS
Type Mini liquefaction plant
Tank net volume 180 m3
Capacity 11 TPD / 4,000 TPA
Size ofliquefaction unit
8 m x 14 m
Gas source Biogas from 50,000 TPA of food waste
Details Fuel production for 135 buses in the city of Oslo
Scopeof supply
Complete plant, incl.• Gas pre-treatment• Cooling system (Ambient
air)• MR liquefaction process• Storage tank• Electrical and control
systems• Service agreementExcl. Civil works and installation
Delivery method EPC
Delivered 2013
01.05.2023 Fredrik Bonäs/ Kenneth Engblom11
© Wärtsilä NOT YET CLASSIFIED 01.05.202312 Fredrik Bonäs/ Kenneth Engblom
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
SMALL/MID SCALE TERMINALS
INPUT OUTPUTTERMINAL
LNG transport
• Carriers• Tanker trucks• Containers• Rail cars
Tank capacity100 – 160,000 m3
(26,400 – 42 Million gallons)Jetty & Marine facilitiesUnloading systemsStorage tanksBoil-off gas handlingRe-gasification• Up to 1,000 TPH
(1,000 MMSCFD)
Export systems
LNG transport• Carriers• Tanker trucks• Containers• Rail cars
Gas send-out
Ship bunkering
TPH = Tonnes Per HourMMSCFD = Million Standard Cubic Feet per Day
01.05.2023 Fredrik Bonäs/ Kenneth Engblom13
© Wärtsilä NOT YET CLASSIFIED
Tornio, Finland
“Providing the only source of gas for industries in Northern Finland.”
Tornio Manga LNGCustomer Manga LNG Oy
Type Small/Mid scale terminal
Tank net volume 50,000 m3
Send out Max 40 tonnes per hour at 6.0 barg
Scope of supply • Civil works and infrastructure
• Full containment storage tank
• Regasification & gas metering
• BOG system• Electrical and control
system• Unloading system• Bunkering and Truck
loading
Delivery method EPC Turnkey
Delivered 2018
01.05.2023 Fredrik Bonäs/ Kenneth Engblom14
© Wärtsilä NOT YET CLASSIFIED
San Pedro de Macoris, Dominican Republic
“Power Plant and LNG supply system combined at the same site.”
Los OrigenesCustomer César Iglesias
Type Combined Power Plant and LNG tank yard
Tank net volume 500 m3
Details LNG delivered by 3 trucks / day, 40 m3 each.
Scope of supply • Complete Wärtsilä 34 dual-fuel power plant including civil works
• Integration of customer’s LNG tank yard
Delivery method EPC
Delivered 2011
01.05.2023 Fredrik Bonäs/ Kenneth Engblom15
© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom16
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
COMMITMENT TO CUSTOMER SATISFACTION
• At Wärtsilä we know that every customer has unique expectations and priorities. We serve all of them with the same level of quality and excellence.
• Projects are tailored to customer needs based on a set of pre-defined scopes and proven designs, that will provide a valuable asset with the highest possible quality at an affordable cost.
01.05.2023 Fredrik Bonäs/ Kenneth Engblom17
© Wärtsilä NOT YET CLASSIFIED
SUPPORT FOR THE WHOLE LIFE CYCLE
24 hTechnical Support
Wärtsilä Services’ global networkWidest range of offering and expertiseWärtsilä Services provides full service throughout the product lifecycle for both Marine and Energy solutions customers,and is constantly developing its network worldwide.
70 countries, 200 locations, 11,000 service professionals
01.05.2023 Fredrik Bonäs/ Kenneth Engblom18
© Wärtsilä NOT YET CLASSIFIED
COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS
Project Development & Financing
Technology EPC Operations & Maintenance
LNG Terminal or Liquefaction Plant