ANNEXURE-1 OFFICE OF THE EXECUTIVE ENGINEER, MEDICAL & HEALTH, UDAIPUR. SPECIAL CONDITIONS OF CONTRACT 1. The work  shall include all lead and fit complete work  in all respect. 2. The contractor shall arrange all men, material  and T & P to complete the work well in time. 3. The contractor will arrange Electricity and water  at his own cost at his level. 4. Any damage occurred to the structure shall have to be rectified by the contractor at his own cost as per direction of  Engineer-in-charge. 5. The quality control tests directed by Engineer-in-charge for materials required for construction for which on site testing facilities and equipments etc. are not provided by the contractor and/or such test are required to be carried form out side laboratories all such tests as directed by the Engineer-in-charge, shall be arranged and got done by the contracting agency at his own cost and no reimbursement and payment shall be made by the department to the contractor on this account. 6. The department engineers shall also test the material with their own equipment as per norms and the contractor will provide all necessary assistance. Department may also engage third party quality assurance  /  evaluation firm for carrying out the test as deemed fit and check  the material lying at the site and the quality control test results conducted by the department. They may also get the selected work  done in their own presence. The contractor shall provide all necessary help and assistance to them. 7. Testing of  material required by Engineer-in-charge shall be the contractor’s responsibility at his cost. 8. For mixing of  concrete and compacting concrete mixer and vibrator shall only be used. The mortar as required for masonry, plaster etc. shall be prepared by means of  C.C. Mixer only. 9. The contractor shall not work  after the Sunset and before sunrise without specific permission of  the Authorized Engineer. 10.No equipment or personnel will be removed from site without permission of  Engineer-in-charge. 11.The contractor shall furnish the programme of  construction for execution of  the work  within the stipulated time schedule together with methodology of construction for each type of  work  and should obtain the approval of  the Engineer-in-charge prior to actual commencement of  work. (Signature of  Contractor  with Seal) 

Annexure1Banswara

Embed Size (px)

Citation preview

8/13/2019 Annexure1Banswara

http://slidepdf.com/reader/full/annexure1banswara 1/4

ANNEXURE-1 

OFFICE OF THE EXECUTIVE ENGINEER,

MEDICAL & HEALTH, UDAIPUR. 

SPECIAL CONDITIONS OF CONTRACT 

1.  The work  shall include all lead and fit complete work  in all respect. 2.  The contractor shall arrange all men, material and T & P to complete the work

well in time. 3.  The contractor will arrange Electricity and water at his own cost at his level. 4.  Any  damage  occurred  to  the  structure  shall  have  to  be  rectified  by  the

contractor at his own cost as per direction of  Engineer-in-charge. 5.  The quality control  tests directed by Engineer-in-charge  for materials  required 

for construction  for which on  site  testing  facilities and equipments etc. are not

provided by  the contractor and/or such  test are  required  to be carried  form out

side  laboratories  all  such  tests  as  directed  by  the  Engineer-in-charge,  shall  bearranged  and  got  done  by  the  contracting  agency  at  his  own  cost  and  no

reimbursement and payment shall be made by the department to the contractor on this account. 

6.  The department engineers shall also test the material with their own equipment 

as  per  norms  and  the  contractor  will  provide  all  necessary  assistance.

Department may also engage  third party quality assurance  /  evaluation firm for

carrying out  the  test as deemed  fit and check   the  material  lying at  the site and

the quality control test results conducted by  the department. They may also get

the selected work  done in  their own presence. The contractor shall provide all necessary help and assistance to them. 

7.  Testing  of   material  required  by  Engineer-in-charge  shall  be  the  contractor’s

responsibility at his cost. 8.  For mixing of  concrete and compacting concrete mixer and vibrator shall only 

be used. The mortar as required  for masonry, plaster etc. shall be prepared by

means of  C.C. Mixer only. 9.  The  contractor  shall  not  work   after  the  Sunset  and  before  sunrise  without 

specific permission of  the Authorized Engineer. 

10.No  equipment  or  personnel  will  be  removed  from  site  without  permission  of  

Engineer-in-charge. 11.The contractor shall furnish the programme of  construction for execution of  the

work   within  the  stipulated  time  schedule  together  with  methodology  of

construction  for  each  type  of   work   and  should  obtain  the  approval  of   the Engineer-in-charge prior to actual commencement of  work. 

(Signature of  Contractor with Seal) 

8/13/2019 Annexure1Banswara

http://slidepdf.com/reader/full/annexure1banswara 2/4

12.If   there  is  any  typographical  or  clerical  error  /  discrepancy of   otherwise  in  the

Schedule  ‘G’  the  rates  as  given  in  the  PWD  BSR  2013  Banswara  circle for building  works  items  and  its  latest  corrigendum  issued  form  time  to  time on which “Schedule-G” has been prepared shall prevail. 

13.Any Material not Confirming to the specification collected at site shall have to 

be  removed  by  the contractor  within  a  period  of   three  days  of   the  instruction

issued by the Engineer-in-charge  in writing,  failing which, such material shall 

be removed by the department at risk  and cost of  the contractor after expiry ofthree days period. 

14.The  Material  collected  at  site  and  paid  provisionally  shall  remain  under  the watch and ward of  the contractor till it is consumed fully on the work. 

15.The  contractor  should  arrange  the  necessary  survey  and  Quality  Control

Equipments at his own cost at work  site for checking of  material and  to ensure

the work  done by his as per specification, as per directions of   the Engineer-in-

charge. 16.Cement from Mini Cement Plant shall not be allowed, and the brand of  cement 

is to be got approved from the Engineer-in-charge before execution of  work. 17.Since  the  printed  agreement  from  of   the  Govt.  Press  in  not  available  and

agreement form printed from local market is used for agreement purpose for of

this  work.  However  in  case  of   printing  mistake  or  any  other  error,  from  the

standard agreement form, the rules and conditions amended by Govt. vide N. F3 (109)/FD/Exp./III/69  part  Jaipur  dated  30.8.93  and  F2  (I)(FD)/Exp./96  dated 12.6.97  and  further amended up  to  8.11.2007  by  the Govt.  from  time  to  time

will be applicable in this case issued up to the date of  issue of  NIT. 18.The labour engaged by the contractor for carrying out the work  shall be at his 

own  risk   and  he  is bound  to protect  the  interest of   labour  rights under  labour

laws and rules prevailing and enforce. 19.The overall cleaning of  site and disposal of  building  rubbish, surplus material

etc. is to done by contractor as directed by Engineer-in-charge. 

20.Contractor  will  make  his  own  arrangement  for  permission  of   vehicles  from

traffic  department,  in  entry  zone  area  and  will  make  his  own  arrangement  of

movement of  vehicles within time allowed by Traffic Police authorities. 21.Kota Stone/Marble Stone/Granite Stone and other building stones to be used in

flooring shall be of  specific size as decided by the Engineer-in-charge only and of  uniform color & shade. No extra payment  is admissible  for use of  specific

size  and  of   uniform  color  &  shade.  The  sample  is  to  get  approved  from Engineer-in-charge before procurement. Drawings enclosed with this document are conceptual drawings and modification may be done, by Engineer-in-charge, 

to match with over all décor and no extra payment shall be paid to contractor on

this account. 

(Signature of  Contractor with Seal) 

8/13/2019 Annexure1Banswara

http://slidepdf.com/reader/full/annexure1banswara 3/4

22.Complete site of  work  will have to be barricaded by 10’ to 12’ ht. G.I. sheet as

per  instruction  of   Executive  Engineer  required  for  work   till  completion  of   the

work  at his own cost. 23.The  Materials  used  in  Doors  frames  and  Sections  Windows  shall  be  ISI 

Marked. 

24.The useful dismantled material shall either be deposited with concerned MO  in

charge or shall be used  in construction  for which  recovery shall be affected as

per rules. 25.The  contractor  or  his  nominated  sub  contractor  should  possess  the  required

valid  license  for  executing  water  supply/Sanitary  works  and  electrical  works also. 

26.Mix  Design  for  Concrete  work   (Ready  Mix/   In-situ)  would  have  to  be  got

approved from the Engineer-in-charge before execution of  the work. The design

shall be arranged by the contractor from authorized institution at his own cost. 27.The Contractor would be allowed  to use only new ply shuttering  for all RCC 

works. 

28.The Contractor has to submit copies of  all the bills of  purchase of  Cement, Steeletc. required by the Engineer-in-charge. 29.Work   of   Anti-termite  Treatment  shall be carried  out  by Lice  need/   Approved 

personals with spray machines. 

30.Contractor  shall  be  fully  responsible  for  provident  funds,  insurance  etc.  for

workers engaged by him on the work. 31.The final bill shall be paid after receipt of  NOC from mining department. 

32.The drawing enclosed with the bid document are the conceptual drawings and

modification may be done to suit the client requirements. 33.Defect  Liability period  of  work   shall  be 3-Year  reckoned  from date  of  actual

completion of  the Building work  (As per Annexure) 34.Regarding  refund  of   Security  Deposit,  Modified  Agreement  Format  shall  be

applicable (As per Annexure) 

35.The Contractor is responsible for design of  RCC members in above work  which

includes  the  submission  of   General  Arrangement  drawings  for  columns,  beam

etc.  with  all  required  soil  and  other  investigations.  After  approval  of   GAD  he

will  carry  out  the  detailed  design  of   RCC  members  from  the  structural

consultant  and  proof   checking  from  the  authorized  institutions,  in  view  of

design being earth quake resistant. After submitting the design and bar bending

schedule of  RCC work  the approval will be given by the competent authority/  Engineer  in charge, only  there after he will start  the work. No Extra payment

will be payable for this  job. 

(Signature of  Contractor with Seal) 

8/13/2019 Annexure1Banswara

http://slidepdf.com/reader/full/annexure1banswara 4/4

 

36.The defect liability period shall be Three years for the work  executed under this

agreement. Security Deposit shall be refunded after Three years from  the date of   actual  completion  of   the  work   provided  the  final  bill  has  been  paid  in

accordance with the Clause 37 of  Agreement. During this period, the contractor 

shall carry out maintenance and rectifications of  defects (if  any) of  the  job at his

own,  failing  which  it  shall  be  carried  out  at  risk   &  cost  of   the  contractor  and

expenditure so incurred shall be recoverable from the contractor. 

37.Deployment of  two site engineer one degree holder (civil) with minimum sevenyear experience and one diploma holder (civil) with 3 year experience has to be

made by contractor at his own cost. 

38.Contractor  has  to  erect  field  laboratory  as  well  as  site  office  as  approved  by

engineer in charge at his own cost. 39.From work  shall be got approved from engineer in charge before laying of  RCC 

work. 

40.Amount  according  to  orders  No.  9568  dated  17.05.2010  issued  by  Principal

Secretary,  Labour,  Employment  &  Technical  Education  (Training),

Government of  Rajasthan (Copy Enclosed) shall be deducted from contractor’s bill as Labour cess. 

41.The  Contractor  shall  engage  unskilled  local  labour  from  Rajasthan  state

preferably of  the district, for the execution of  the work. 

42.The  breakup  of   the  components  of   labour  /   cement/   steel/   other  materials  as

indicated in Clause 45 (Price Variation Clause) have been determined as below

and shall be a part of  the agreement. 

a) Labour  20%

b) Cement  18%

c) Steel  35%

d) Other materials  27% 

(Signature of  Contractor with Seal)