Upload
peter-zhou
View
38
Download
1
Embed Size (px)
Citation preview
Prepared by : Peter Zhou Date: January 2011
[Date Month 20XX, Name, Department, etc.]
Some Fundamental Concepts onCOST OF QUALITY
Name of presentation2
Poor Quality…Poor Business !
It is a time bomb waiting to Explode!
IF COQ high,
Name of presentation3
4~5% of Sales
Wastes
Testing costs
Rework
Customer return
Line RejectsDefect
Recall
Traditional Cost of Poor Quality (COPQ)
Name of presentation4
Additional Costs of Poor Quality (COPQ)
Name of presentation5
The highest quality producer is the lowest cost producer
Balance in Quality Cost
Name of presentation6
Taguchi Quality Loss Function (QLF)
Quality cost are usually quantified in terms of tangible cost such as rework and scrap cost, and customer warranty. These losses constitute only the tip of the iceberg.
What about the intangible costs such as management/engineering time, inventory, customerdissatisfaction, and loss market share?
QLF is a method used to approximate these hidden and long term losses.
(1) Trial-and-error approach
(2) Design of experiments
(3) TAGUCHI Method
Dr. Genichi Taguchi
Name of presentation7
Taguchi Quality Loss Function (QLF)
Value of quality characteristics
Loss
$
y
L = k ( y - T )²
L = Loss in $’sk = Cost coefficienty = Value of quality characteristics.T = Target value.
LSL USL
Name of presentation8
Why Examine the Cost of Quality?1. Get management attention
2. Change the way employee think about errors
3. Provide better return on the quality improvement program
4. Provide a tool to measure impact of corrective actions
5. Provide a tool to measure the impact of poor-quality on profits
Prevention Scrap
Elements of Cost of Quality (COQ)
Name of presentation9
Resultant Cost = Failure Cost, Defect Cost.Controllable Cost = Prevention and Appraisal Cost.
Prevention vs. Scrap Cost
0
10
20
30
40
50
60
Controllable Effort
Cos
t
Total Cost
Controllable Cost
Resultant Cost
A
Low High
Name of presentation10
1. Prevention Cost- Cost of all activities specifically designed to prevent poor quality in products.
2. Appraisal Costs.- Cost associated with measuring, evaluating or auditing products to ensure conformance to quality standards .
3. Internal Failure Costs.- Failure costs occurring prior to delivery or shipment of the product.
4. External Failure Costs.- Failure costs occurring after delivery or shipment of the product.
Elements of COQ
Name of presentation11
Cost of Conformance
• Prevention-Cost associated with design, implementation and maintaining a quality system
• Appraisal-Cost associated with measuring conformance
Name of presentation12
Examples of Prevention Costs
• Developing the quality / process control plan
• Quality education and training.
• Vendor surveys (Supplier Quality Assurance )
• Design reviews.
• Quality Improvement Team projects.
Name of presentation13
Supplier Quality CostSupplier Quality Cost can be categorized as part of Prevention Cost as it involves Quality Assurance of Incoming materials. Apparent Supplier Quality Cost
Cost of Supplier Quality Surveys.Cost of Receiving and Source Inspection.Cost of dispositioning nonconformance purchased materials.Cost of scrap and rework of supplier caused nonconformance.Cost of site visit to correct supplier service problems.
Hidden Supplier Costs
Cost incurred by supplier at the supplier’s facilityCost incurred by buyer in solving problems at the supplier’s facility
Name of presentation14
1. Cost of processing incoming rejection (documentation, return expenses) : Study show that each rejected lot would require $100 to process
Two rejected lots = 2 Lots X $100/Lot = $200
2. Cost of complaint investigation ( BUQE) Man hours required to investigate the root cause. Study show cost per man hour is $20
10 Man hours required = 10 man hrs X $20/man hr = $200
3. Cost of receiving Inspection (IQA) Use IQA inspector labor standard and average hourly wages to process the problematic lots. Inspector require 1.2 hours to process one lot, and their hourly wage is $15.
1.2 labor hrs/Lot X $15/labor hour X 2 Lots = $36
4. Total purchased from supplier = $10,000. ($36 + $200 +$200 ) + $10,000 $10,000
QCPI =FAIR
= 1.044
Example
Supplier having two rejected lot for month of June:
Name of presentation15
Prevention Cost - 1
Category Description Example
Quality Education and Training.
为达到质量要求或改进产品质量的目的,提高员工的质量意识和质量管理的业务水平进行培训所支付的费用。包含授课人员的费用,资料费,及培训人员的费用等。
Developing the Quality / Process Control Plan
为推行质量管理、提高职工的质量意识等一系列活动所支付的费用。包含质量奖励费、活动经费、场地费、差旅费等。
Quality Management Cost
从事质量管理人员的工资。
Name of presentation16
Prevention Cost - 2
Category Description Example
Apparent Supplier Quality Assurance
-Supplier Quality Surveys -Receiving and Source Inspection.-Dispositioning nonconformance purchased materials.-scrap and rework of supplier caused nonconformance.-site visit to correct supplier service problems.
Hidden Supplier Quality Assurance
-Cost incurred by supplier at the supplier’s facility-Cost incurred by buyer in solving problems at the supplier’s facility
Quality Improvement
Projects
-PBU and SBU product or process continuous improvement project (e.g. Tool life management, Blade etc)
Name of presentation17
Examples of Appraisal Costs
Quality audits of the process.
Inspection and testing of products.
Inspection of purchased materials.
Calibration of test equipment.
Quality data processing.
Field performance testing.
Name of presentation18
Appraisal Cost-1
Category Description Example
Quality System Audit
对企业的质量体系、环境体系和职业健康安全体系进行审核所产生的费用。包含人工费用和差旅费等。
Calibration of Test Equipment, Tools, Jig & Fixture
工具和 PPE的校准所产生的费用。包含校准设备费用,人工费用等。
Customer Satisfaction Survey
为了了解顾客对 Vestas提供的产品或服务的反馈而进行的调查所产生的费用。包含人工费用、差旅费和礼品费等。
Name of presentation19
Appraisal Cost-2
Category Description Example
Quality Data Processing
The organization needs to regularly collect and analyze the product /service quality performance (e.g. Cost of Poor Quality, First Time Yield, and Customer Complaint, etc)
Field Performance Testing
Regular product performance test and evaluation after installation in the field to properly evaluate or justify the operation satisfaction (e.g. SCADA)
Inspection and Testing of products
0.00%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Prevention
1.00%
2.00%
3.00%
4.00%
5.00%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Internal scrap% Internal Goal
Internal&Scrap% -Crystal
0.00%
0.05%
0.10%
0.15%
0.20%
0.25%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
External
External% - Crystal
0.00%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Appraisal
Prevention% - Crystal Appraisal% - Crystal
COQ % Trend---Example
0.00%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Prevention
1.00%
2.00%
3.00%
4.00%
5.00%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Internal scrap% Internal Goal
Internal&Scrap% -Crystal
0.00%
0.05%
0.10%
0.15%
0.20%
0.25%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
External
External% - Crystal
0.00%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Appraisal
Prevention% - Crystal Appraisal% - Crystal
COQ % Trend---Example
Name of presentation20
Cost of Non-conformance:
•Internal Failure- Cost associated with internal non-conformance (detected prior to delivery of a product or service)
•Appraisal- Cost associated with external non-conformance (detected after delivery of a product or service)
Name of presentation21
Examples of Internal Failure Costs
In Process scrap and rework
Engineering changes (ECN)
Re-inspection after rework
Downgrading
Expediting (Freight)
Terminated projects
Name of presentation22
Internal Failure - 1
Category Description Example (In Process) Rework
产品质量不良在堆场返修费用 /在风场返修费用 /在安装风机上返修费用 /服务期间在风机上面的返修费用例子: V52散热系统不良在现场返修费用;塔筒内饰件安装错误在现场返修费用; CIM在堆场和风机上的返修费用 (In Process) Scrap
被运输损坏的产品产生的报废费用;产品质量不良的报废费用;调试时不良品的报废费用;服务期间产品可靠性质量问题导致的报废费用例子:叶片运输损坏报废;轮毂运输损坏报废;螺栓质量不良的报废费用;偏航传感器质量问题;齿轮箱担波质量问题
(In Process) Scrap
批次性产品质量不良;重大产品质量不良;重复性产品质量问题例子:威海螺栓质量不良进行三方测试费用;如东服务期间叶片表面脱离维修;石城服务期间叶片由于缺胶导致破裂; V52机舱灯管脱落问题;天窗破裂质量问题
Name of presentation23
Category Description Example
Engineering Changes Request (ECR)
Launched existing product that needs to be further modified to meet China market industry standard requirement (e.g. Safety emergency button)
Transportation & Expediting (Freight)
Product damager due to the transportation quality incident. Sometime we can’t fix the damage part by repairing and will have to express-ship backup from factory or warehouse
Stall or Delay On
Job Sites
产品不良影响发货的压车费用;返修产品导致吊车等待费用 ; Main crane is waiting for Project start ; And sometimes it takes some time if many people have not the solution but different idea’s
Internal Failure - 2
Name of presentation24
Examples of External Failure Costs
Warranty administration
Field repair stock
Product recall and field updates
Customer rejects and returns
Canceling suppliers
Product liability suit
Name of presentation25
External Failure - 1
Category Description Example
Warranty Administration
质保期间的相关费用例子:维护和保养中涉及的人工费 / 材料费 /办公费 /运输费 /基础设施费用等
Product Recall and Field Updates
产品不良导致客户不收货的费用例子:中海油工厂出货检查发现质量问题拒绝发货,产生的压车费 /存储费 / 维修费 /人工费 /物料费等;蓬莱现场发现收到的叶片外观不良拒绝收货,产生的换货产品成本 / 运输费用 /吊车费用 /人工费等
Customer Rejects
and Returns
由于产品质量问题,客户拒绝签署 PAC或者索赔损失电量;客户投诉所产生的费用。包含维修费用,退货费用,更换费用,差旅费等。例子:拒绝 PAC导致质保期延迟,增加工具租赁费 /人工费 /材料费等;风机停转导致客户索赔发电损失量
Name of presentation26
Category Description Example
Product Liability Suit
Wind turbine fire accident due to product design natured failure or product reliability
Canceling Suppliers
The lifting supplier company does not follow Vestas WI to potentially damage the Nacell with a decision to cancel this supplier
External Failure - 2
Name of presentation27
Tracking on Monthly Basis
Measure
BU Name:COQ Details: Plan Plan Plan Plan Plan Plan
Dollars % % Dollars % % Dollars % % Dollars% % Dollars % % Dollars % %Quality administrationQuality trainingQuality assurance systemProduct and process qualificationQuality requirement planningSupplier evaluation & certification
TTL Preventive costIncoming inspectionTest equipment calibration & repairIn-process inspectionFinal inspectionProcess evaluationIn-process testingQuality assurance testingUtilities, supplies, products, etcQuality audits
TTL Appraisal costScrapReworkSortingIncoming material dispositionReject dispositionCorrective action evaluationRe-inspection
TTL internal failure costCustomer complaint evaluationReturned goods rework & sortingReturned goods replacementReturned good processingLegal/settlement cost
TTL external costTTL Quality Cost
May JunActualActual Actual Actual Actual Actual
Jan Feb Mar Apr
Name of presentation28
Crystal COQ Matrix Trend
Scrap $ rate - Crystal
0.131
0.0700.159
0.200
0.1270.175
0.0000.0300.0600.0900.1200.1500.1800.2100.240
Mar Apr May Jun Ju
lAug
Sept
Oct Nov Dec
Scrap $ rate Goal
$
40%
50%
60%
70%
80%
90%
100%
Jan
Feb Mar Apr May Jun Ju
lAug Sep
tOct
Nov Dec
Total Yield Goal
Yield - Crystal
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
Mar Apr May Jun Jul Aug SeptOct Nov Dec020000040000060000080000010000001200000
Scrap $ Total COQ % COQ% Goal
Total COQ %&Scrap - Crystal
Name of presentation29
0.00%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Prevention
1.00%
2.00%
3.00%
4.00%
5.00%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Internal scrap% Internal Goal
Internal&Scrap% - Crystal
0.00%
0.05%
0.10%
0.15%
0.20%
0.25%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
External
External% - Crystal
0.00%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Appraisal
Prevention% - Crystal Appraisal% - Crystal
COQ % Trend---Crystal
Name of presentation30
Pareto of Broken/Dead Failure Analysis
0%10%20%30%40%50%60%
Broken Freq. OutRange
Scratch Lessadhesive
Short BP low Mix Mis-alignment
Rotation
Broken and Dead
0.0130
0.0140
0.0150
0.0160
0.0170
0%
10%20%
30%
40%50%
60%
B/P M/C F/P Weld F/T
0%10%
20%30%
40%50%
Broken at
ConnerBroke
n at
middle Handling
Broken
Dead
Name of presentation31
Dead/Broken Fish Bone Diagram
Dead/Broken
MachineManpower
Drop to the ground
Transportation Shock
Material
Chipped Blank
Wrong Handling
Hardness of Base Tabs
Poor Slot roughness of base
Lead Cutter Shock
Ultrasonic Levelof Blank WasherHandling broken
Large Welding Pressure
Stamping Shock
Method
Unsafe Package
Cement Volume
Mount Rotation
Low viscosity of Adhesive
Product mix
Pattern alignment
insufficient epoxy amount
Adhesivecontamination
Bubble in epoxy
Slut knife of lead cutter/former
B/P plate dead
Large spot size
for some modelUM5 shield
with poor edge
Not optimized BP maskdesign for MS model
Appendix
[Date Month 20XX, Name, Department, etc.]
Name of presentation33
Quality Assurance-COPQ
Name of presentation34
Copyright NoticeThe documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by anymeans - such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, oranyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” andVestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.
Thank you for your attention