Upload
andrew-blair
View
172
Download
0
Embed Size (px)
Citation preview
CURRICULUM VITAE
Of
ANDREW MICHAEL BLAIR
Personal Info
Name: Andrew Michael
Surname: Blair
Identity Number : 6105205120083
Passport : AO1163525
Expiry date 07 July 2020
Address: 56 Beaunoir Avenue
Merewent
Durban
Kwa-zulu-Natal
4052
South Africa
Health: Good
Criminal records: NONE
Drivers licence: EB
Contact details: 0744399113 /0631025040/0636501181
Email Address : [email protected]
Skype Address : drewblair1
Languages : English / Afrikaans / Zulu
Secondary School : Little Flower High School
Highest Grade Passed : Standard 8 [ 1976 ]
QUALIFICATIONS /TRAINING
Health and Safety Training for Supervisors [Fluor)
Technilaw Health and Safety for Supervisors (Richards Bay)
Welding
Pipe -Fitting
Plumbing
Piping Foreman / Supervisor
Safety Leadership Training
Grinder and hand safety
Working at heights training
Confined space training
WORK EXPERIENCE
Motor Trade,Building,Paper & Pulp,Petro–Chemical,Chemical Food & Beverage,Mining,Breweries,Refridgeration,etc
REFERENCE (WORK HISTORY)
Company : SBS Engineering [ Mondi - Richards Bay ] [Brown Liner Project ]
Duration : July 2015 - January 2016
Position : Supervisor cum , QA , QC ,Field Engineer
Task : Scoping , Plan and Prep . Supervising Boilermakers , Pipe fitters ,Mechanical fitters, Hydro test crews,Welders , semi –
skilled labour.
Ensuring all task that are given are executed safely , timeously and professionally . Navisworks [ print photo shots
for supervisors and pipe fitters . Attend Production meetings , liasing with client QC .
Punching of completed lines with Client QC , compiling of QCP‘s etc .
Reason for leaving : Unfair Labour Practises
Contact Riaan Du Preez [ site manager ] 0793262381
Company: Craft Corp (Fluor SA)
Duration: January 2014 - June 2014
Position: Piping Supervisor (SASOL-ONE REFINERY) SASOLBURG
Task: Liaise with Client, Planners, QC/QA, HSE, scaffold, rigging, welding, mechanical departments. Plan and prepare safe working conditions for the work team/crew identify various materials for the tasks to be executed. Ensure all given tasks are executed in a safe and timeous manner and to quality standards .Ensure all permits, risk assessments, job safety task assignments (JSTA) / daily safety task assignments(DSTA) are correctly filled and explained to the work team/crew, all hazards, risks, dangers, etc pertaining to the daily chores in the work area. Communicate with other contractors and employees in the work area concerning the daily tasks to eliminate injuries and time loss, attend production meetings.
Reason for Leaving: End of contract
Contact: Ebie Leonard +27 722 074 746
Company : Mac Labour ( SBS Engineering ) Bosch
Duration : January 2013 – November 2013
Position : Construction cum Site Manager , QA , QC ,Field Engineer
Task : Scoping , Plan and Prep . Supervising Boilermakers , Pipe fitters ,Riggers , Mechanical Fitters,Hydro test crews,Welders ,
Semi –skilled labourers .
Ensuring all given tasks are executed safely , timeously and professionally . Navis-works [ print photo shots
for supervisors and pipe fitters . Attend Production meetings , liase with client QC .
Punching of completed lines with Client QC , compiling of QCP‘s etc ,commissioning
Reason for leaving : End of Contract
Contact : Charles Raaff 031 5356000
Company: Rodcon (Goss & Balfe)
Duration: June 2011 – 16 September 2011
Position: Piping Supervisor (SAPREF)
Task: Scoping, Plan & prep 2011 Turnaround. Supervise work-force to execute all given tasks safely, timeously, professionally and to uphold quality standards,
Reason for Leaving: End of contract
Contact: Kresen Pillay (083 7791121) Managing Director
Company: INDLANIFA TRADING (ELGIN ENGINEERING) NMPP PROJECT
Duration: January 2011 – April 2011
Position: Supervisor (Workshop)
Task: (Repairs to NMPP PROJECT Skids that were damaged whilst being transported from India to South Africa by ship) Supervise Boiler-makers, Pipe fitters, Instrument fitters, ,Hydro test crew,Mechanical Fitters Welders, Semi-skilled and Labourers to carry-out and ensure all tasks were completed on/before schedule. Ensure adherence to safety, professionally and quality standards. Ensure given tasks completed timeously, witness Hydro/Pressure tests with QA/QC department
Reason for Leaving: End of Contract
Contact: Cori Henri (Manager) +27791149171
Company: SS Engineering (Elgin Engineering )
Duration: November 2010 – December 2010
Position: Supervisor (Workshop) Night shift
Task: Fabrication of new Furnace Tubing (Chrome) for Engen Refinery. Motivate and supervise the entire work crew and ensure adherence to professionalism, safety and quality standards, ensure tasks completed timeously
Reason for Leaving: End of Contract
Contact: Radlin (Recruitment Officer) +27798822918
Company: Craft Corp (Fluor) SASOL 1, 2 and 3
Duration: 2005 – 2010 (Broken service due to E.O.C`s)
Position: Boilermaker/Pipe fitter. Piping Supervisor
Task: Motivate, supervise the work force to ensure adherence to given activities professionally, safety and quality standards, ensure all given tasks completed timeously
Reason for Leaving: End of Contract
Contact: Ebie Leonard (Manager) +27722074746
Company: B&W Instuments & Electrical (Madagascar)
Duration: June 2010 – October 2010
Position: Instrument Technician
Task: Bending and installation of instrument tubing
Reason for Leaving: End of Contract
Contact: Ulryck Meyer(HR Manager)0119071663
Company: Rodcon (Goss & Balfe) AECI, CANELANDS, SAPREF
Duration: (Broken services)
Position: Boilermaker
Task: Boiler-making, pipe fabrication/fitting, structural welding
Reason for Leaving: Resigned due to contracts being awarded to my company and having to execute the contracts
Company: Blair`s Maintenance and Welding Services cc (ILLOVO SUGAR COMPANY)
Duration: December 2004 – April 2010
Position: Director (Owner)
Task: Supervise shutdown activities to ensure adherence to safety and quality standards. Verify pre-shutdown work assumptions. Supervise work activities and work force requirements to meet required completion dates. Supervise the coordination of craft personnel, material and equipment to meet schedules while adhering to cost goals. Assign work to craft foreman, give instructions relative to safety, method, procedures and desired results. Perform JSA`s (Job Safety Analyses). Develop detailed crew assignments. Obtain permits for work etc. TSTI (TASK SAFETY TRAINING INSTRUCTION) Work with QA QC, etc
Company: OMAN-PROMAN (Sohar) UNITED ARAB EMIRATES (Methanol Plant)
Duration: 2008
Position: Supervisor (Nightshift) Methanol Plant
Task: As all of the above
Reason for Leaving: End of Contract
Contact: Claude Ryan (Superintendent) 0624750077