    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 1

    Overviewon Radioact ive Waste Management in Germany

    and

    Russian  – German R&D Cooperat ion in this Field

    Jürgen Krone 

    DBE TECHNOLOGY GmbH

    Peine, Germany

    [email protected] 

  • 8/9/2019 Kronek[1].pdf

    2/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 22

    DBE - plans, constructs and operates all Federalrepositories for radioactive waste on behalf of BfS

    BfS - responsible office of the Federal Government for

    repository construction and operation

    Federal Government - provision of repositories for

    radioactive waste disposal (§ 9a, Abs. 3, AEA)

    Organisation of Radioactive Waste Disposal

  • 8/9/2019 Kronek[1].pdf

    3/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 3

    Implementing Organisation

    Engineering and consulting for

    radioactive waste

    management

    Repository design,construction and operation

    75 %25 %

    Shareholders

    100 %

  • 8/9/2019 Kronek[1].pdf

    4/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 4

    Legal Framework - Competencies

    Disposal

    Exploration

    Construction

    Operation

    Decommissioning

    Distribution of responsibilities for radioactive waste management

    NPP operator

    Federation

    Financing of Construction, Operation and

    Decommissioning of NPPs

    Development of suitable techniques for the treatment ofwaste and spent fuel

    Execution of reprocessing and conditioning

    Interim Storage

    Financing of disposal

  • 8/9/2019 Kronek[1].pdf

    5/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 5

    Financing System

    Reimbursement of repository construction costs(Ordinance on Advance Payments)

    •  BfS on behalf of the Federal Government invoices the actually

    incurred costs to the waste producers legally obligated to share the

    costs

    •  Distribution of costs to the NPP operators is based on the

    installed nuclear capacity

    •  Share to be carried by other Waste Producers is based on distribution

    scheme previously agreed upon

  • 8/9/2019 Kronek[1].pdf

    6/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 66

    Stable Consensus on Geologic Disposal

    Political decision in the early 60s:

      Consider geologic disposal as the most sustainable and only

    disposal option for radioactive waste

    Cancellation of deep sea dumping

    No long-term storage option

    No near surface disposal option

    Not questioned within four-decades, even radioactive waste

    management has been a hot spot of the public debate on nuclear

    energy permanently

  • 8/9/2019 Kronek[1].pdf

    7/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 77

    Why Geologic Disposal Only?

    Perception of the few hundred meters thick geologic barrier as

    sufficient protection

    Favourable geologic conditions – particularly more than 200 saltdomes in northern Germany

    Best conditions for non-retrievable maintenance free disposal – without institutional control requirements

    High population density stressed as argument against surfacedisposal

    Simplification of waste classification:

     just heat and non-heat generating radioactive waste

  • 8/9/2019 Kronek[1].pdf

    8/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 8

    Morsleben Repository

  • 8/9/2019 Kronek[1].pdf

    9/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 9

    1970 Transferto GDR NPP Operator

    1971 Startof Trial Operation (LLW)

    1974 Repository Construction Approval

    81/86 1st and 2nd Licenses for

    Continuous Operation10/90 Morsleben becomes a

    Federal Facility

    Morsleben Milestone

  • 8/9/2019 Kronek[1].pdf

    10/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 10

    91 –

     94 Waste Disposal Interruption(Until Feb. 91: 14.300m³ Waste)

    09/98 Waste Acceptance discontinued

    05/99 BfS: No further Waste Disposal

    Licensing of closure

    and decommissioning

    11/2000 Beginning of stabilizing

    and backfilling thecentral part of the mine

    2014 License for closure (expected)

    Morsleben Milestone

  • 8/9/2019 Kronek[1].pdf

    11/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 11

    Morsleben Repository Operation

  • 8/9/2019 Kronek[1].pdf

    12/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 12

    Disposal Chamber

  • 8/9/2019 Kronek[1].pdf

    13/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 13

    Konrad Repository 

  • 8/9/2019 Kronek[1].pdf

    14/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 14

    Konrad Repository Milestones

    1965 – 1976 Iron ore mining

    1975 - 1982 Site suitability investigation

    1982 Licensing procedure started

    1992 - 1993 Public hearing

    (800,000 inquiries)

    05.06.2002 License granted

    for 300,000 m³ L/ILW 

    09.05.2006 Court rejected all objections

    without revision opportunity2007 Construction started

    2021 Commissioning Target

  • 8/9/2019 Kronek[1].pdf

    15/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 15

    Konrad‘s Unique Geology

    … cannot be searched stepwise but just found. 

  • 8/9/2019 Kronek[1].pdf

    16/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 16

    Konrad Emplacement Technology

  • 8/9/2019 Kronek[1].pdf

    17/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 17

    Waste Handling Demonstration

  • 8/9/2019 Kronek[1].pdf

    18/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 18

    Gorleben Exploration Mine

  • 8/9/2019 Kronek[1].pdf

    19/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 19

    Gorleben Exploration Mine

    Purpose: Investigate the GORLEBEN salt

    dome’s suitability to host a

    repository for HLW and SNF

    1972 – 76 Siting studies – salt dome screening

    1977 Political decision to start site

    investigation at Gorleben

    1979 Start of above ground site

    characterization

    1986 Start of shaft sinking

    1996 Start of underground site

    characterization

    2000 Moratorium on site exploration

    2010 Site exploration restartedNov. 2012 New interruption of site exploration

    Mar. 2013 Preliminary safety case

    July 2013 New law: Restart site selection

  • 8/9/2019 Kronek[1].pdf

    20/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 20

    Cross-section of the Gorleben Salt Dom

  • 8/9/2019 Kronek[1].pdf

    21/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 21

    Gorleben Repository Project

  • 8/9/2019 Kronek[1].pdf

    22/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 22

    Design of the Entire Repository  – Drift Disposal Concept

  • 8/9/2019 Kronek[1].pdf

    23/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 23

    Russian  – German Research Cooperation

    June 2001: Agreement between MINATOM and Federal Ministry ofEconomy to enter into a R&D-Cooperation regarding radwaste

    disposal

    Project B.2 Investigations regarding HLW disposal in granitoide formations

    Russia Germany

    Coordinators VNIPI Promtechnologii DBE TECHNOLOGY GmbH

    Participants Radium Institute

    Mining-Chemical Combine

    IGEM

    VNIPIETNO.RAO

    Federal Institute for Geosciences

    and Natural Resources(BGR)

    Gesellschaft für  Reaktor- und

     Anlagensicherheit (GRS) mbH

  • 8/9/2019 Kronek[1].pdf

    24/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 24

    Russian  – German R&D Cooperation

    1st Phase:

    2002 - 05

    Requirements for Site Investigation for a

    HLW Repository in Hardrock Formations

    Objective: To develop a well-justified methodological

    approach for site investigation and selection for

    disposal of•  conditioned HWL sludge from former weapon

    plutonium production and

    •  vitrified reprocessing HLW

    in the Nizhnekansk granite formation near

    Krasnoyarsk

    Funded by: Rosatom & Federal Ministry of Economy

  • 8/9/2019 Kronek[1].pdf

    25/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 25

    • Specification of data

    requirements

    • Drafting of recommen-

    dations for further site

    investigation

    • Joint project report in

    Russian and German

    published in May 2005

    Main Project Results

  • 8/9/2019 Kronek[1].pdf

    26/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 26

     Yeniseyskiy Site: Top View

  • 8/9/2019 Kronek[1].pdf

    27/28

    Jürgen Krone – 31/10/2013

     AtomEco 2013, Moscow 27

    Russian  – German R&D Cooperation

    2nd Phase:

    2005 – 08

    Performance investigation of engineered and geological

    barriers of a HLW repository in magmatic host rock

    Motivation:

    Objective:

    Dispute between Russian experts on the “importance” of

    geologic vs. engineered barriers

    Safety function based performance analysis of the system

    of geologic and engineered barriers for the proposed HLWdisposal facility at the Yeniseyskiy site

    3rd Phase

    2009 – 16

    Investigation of the robustness of an HLW disposal

    system in magmatic rock and its safety - PSAR (2014)

    Funded by: Rosatom (NO.RAO) & Federal Ministry of Economy

  • 8/9/2019 Kronek[1].pdf

    28/28

    Jürgen Krone – 31/10/201328

    Thank you for your attention

    Quest ions ?