12
Second Quarter 2011 Activity Report Enquiries: Abbas Al‐Rasheed Public Relations Advisor Kuwait Energy Company Tel: (+965) 2575 5657 – 2575 5878 / Ext 314 Fax: (+965) 2575 5679 Mobile: (+965) 9729 8106 Email: [email protected]

Kuwaitenergy Second Quarter 2011 Activity Report

Embed Size (px)

DESCRIPTION

Kuwaitenergy Second Quarter 2011 Activity Report

Citation preview

Page 1: Kuwaitenergy Second Quarter 2011 Activity Report

      

      Second Quarter 2011 Activity Report

Enquiries: 

Abbas Al‐Rasheed Public Relations Advisor Kuwait Energy Company Tel: (+965) 2575 5657 – 2575 5878 / Ext 314 Fax: (+965) 2575 5679 Mobile: (+965) 9729 8106 Email: [email protected] 

Page 2: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 2

Forward looking statements 

 

This Quarterly Activity Report    includes statements  that contain words or phrases such as  “will”,  “aim”, “will  likely  result”,  “believe”,  “expect”,  “will  continue”,  “anticipate”,  “estimate”,  “intend”,  “plan”, “contemplate”,  “seek  to”,  “future”,  “objective”,  “goal”,  “project”,  “should”,  “will  pursue”,  and  similar expressions  or  variations  of  such  expressions  which  are  “forward  looking  statements”.  Such  forward looking  statements  are  by  their  nature  speculative  and  based  on  various  assumptions.  Any  such statements  are  hypothetical  with  respect  to  prospective  events  and  should  not  be  construed  as  being indicative of the actual events which will occur or a guarantee of future performance. All forward‐looking statements  are  subject  to  risks,  uncertainties  and  assumptions  that  could  cause  actual  results  to  differ materially from those contemplated by the relevant forward looking statements. 

 

Important factors that could cause results to differ materially from the Company’s expectations include, among others: 

 

General economic and business conditions in Kuwait and other countries;  The Company’s ability to successfully implement its strategy, growth and expansion plans and 

technological changes;  Changes in the value of the Kuwaiti Dinar and other currency changes;  Changes in Kuwaiti or international interest rates;  Changes in laws and regulations that apply to investment companies in Kuwait;  Changes in political conditions in Kuwait and other countries; and  Changes in the foreign exchange control regulations in Kuwait. 

 

 

Disclaimer: All information provided in this report is for information purposes only. All financial information is unaudited and is subject to an annual financial audit.

Page 3: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 3

Contents

 

1.  Executive Summary ................................................................................................................................... 4 2.  Reserves .......................................................................................................................................................... 7 3.  Production ..................................................................................................................................................... 8 4  Development Activity ............................................................................................................................ 10 5.  Exploration Activity ................................................................................................................................ 11 6.  Financials .................................................................................................................................................... 12  

 

 

 

Cover Picture: Kuwait Energy signing Siba and Mansuriya gas development contracts in Baghdad, Iraq. 

  

 

 

 

   

Kuwait Energy Company KSCC Salem Al Mubarak St., Laila Tower, Block 4, Bldg. #35, 13th Floor, Office 2, Salmiya, Kuwait 

P.O. Box. 5614, Salmiya 22067 Kuwait Tel: (965)2575‐5657 Fax: (965) 2575‐5679 

Page 4: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 4

 1. Executive Summary: Second Quarter 2011 Activity Report 

For the period ended 30 June 2011 

Comparative Performance at a Glance 

Quarterly comparison    Q2 2011  Q1 2011  Change % 

Production  boepd  12,902  12,985  ‐0.6% 

Revenue*  US$ Million  46.5  41.4  12.3% 

Year­on­year comparison  Q2 2011  Q2 2010  Change % 

Production  boepd  12,902  13,074  ‐1.3% 

Revenue*  US$ Million  46.5  36.9  26.0% 

* Revenue reported is sales less profit petroleum  

 Quarterly production and sales summary – second quarter 2011 

  Revenue was US$46.5 million for Q2 2011, a quarterly record; up 12.3% from Q1 2011 and 

26.0% from Q2 2010, primarily due to higher realized oil and gas prices.   

Daily  average  working  interest  production  for  Q2  2011  was  12,902  barrels  of  oil equivalent per day (boepd), a 0.6% decrease on  the previous quarter. This decrease was primarily due to production in the Luzskoye field in Russia being shut‐in for 40 days while a new bridge  to  transport  the oil was being  constructed  to  replace  the old bridge which was damaged by floods.  

 Key activities during the period 

Financial 

IPO  Update:  Following  approval  from  shareholders  at  the  2009  AGM,  Kuwait  Energy retains  its  intention  to  list  on  the  London  and/or  Kuwait  Stock  Exchanges,  the  timing  is dependent  on  market  conditions.  Kuwait  Energy  is  on  track  in  terms  of  its  internal preparation. 

  Receipt of Divestment Proceeds: Kuwait Energy received the final payment of divestment 

proceeds for the sale of 22% working interest in Abu Sennan, Egypt.  

2010 Financial Results and Dividend Announcement: Kuwait Energy provided its 2010 Financial  Reports  and  declared  a  dividend  of  5  fils  per  share  at  the  General  Assembly Meeting held on 27 June 2011.   

Page 5: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 5

Key activities during the period (continued) 

Operations 

Health, Safety, Sustainability and Environment: Kuwait Energy classifies  its  recordable incidents  as  Lost  Time  Incidents  (LTI),  Restricted  Work  Incidents  (RWI)  and  Medical Treatment Incidents (MTI). During Q2 2011,  five recordable  incidents occurred, two RWIs in Kuwait  Energy’s  operated  assets  BEA  and Area A,  Egypt,  two MTIs  in Kuwait  Energy’s non‐operated  Karim  Small  Fields  (KSF),  Oman,  and  one  LTI  in  Kuwait  Energy’s  non‐operated ERQ asset, Egypt. 

     The  following  table provides days without Lost Time  Incidents  for  the countries  in which 

Kuwait Energy operates:   

Country  Days without Lost Time Incidents 

Egypt  929

Yemen  394

Russia  546

Ukraine  834

  

Exploration: Three exploration wells were drilled during Q2 2011 with two of these wells successfully discovering oil.  The Shebyl East‐1 well in ERQ, Egypt was drilled to a depth of 4,100 meters and initial tests showed a production flow of 1,500 barrels of oil per day. The ZZ‐4 well  in Abu Sennan, Egypt encountered oil  in the Lower Bahariya formation and was suspended for testing.    

Development:    Twelve  development wells were  drilled/spud during  the  quarter;  nine  in Oman, two in Egypt and one in Russia. 

  Portfolio Management:  

  Kuwait  Energy  continues  to  work  on  closing  the  15%  working  interest  partial 

divestment in Mesaha, Egypt to Beach Energy.   Kuwait  Energy  and  East West  Petroleum  have  agreed  not  to  pursue  the  Sale  and 

Purchase  Agreement  for  the  partial  divestment  of  Kuwait  Energy’s  20% working interest in Burg El Arab, Egypt. 

Kuwait Energy  is  continuing  its  effort  to balance  its  asset portfolio  and  is  actively looking for strategic partners to farm in to some of its non‐core assets. 

    

Page 6: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 6

Key activities during the period (continued) 

Business Development  Kuwait Energy is pursuing its growth strategy with a main geographical focus on the MENA region; specifically Egypt, Yemen and Iraq.  

         Iraq Opportunities:   

Iraq’s third petroleum licensing bid round On 20 October 2010, Kuwait Energy participated  in  Iraq’s  third petroleum  licensing bid  round and was awarded 20 year term gas development contracts for the Siba and Mansuriya fields. The Siba and Mansuriya gas contracts were signed on 5 June 2011.  

 Picture: Kuwait Energy CEO, Ms Sara Akbar, signing the Siba and Mansuriya gas development contracts in Baghdad, Iraq. 

Iraq’s fourth petroleum licensing bid round Iraqi Ministry of Oil announced its intention to offer 12 exploration blocks covering various locations in Iraq.   Details of the fiscal terms are yet to be provided.   The initial timeline is that technical data will be available for purchase is approximately August, fiscal terms and draft contract will be released in November and the bidding/awarding will take place in January 2012.  Kuwait Energy is conducting preliminary  technical  evaluation  of  the  blocks  and  screening  possible  prospects  with  potential partners. 

Yemen Opportunities:   

An  assessment  of  Yemen  gas  resources  and  a  feasibility  study  (Yemen  Gas  Master  Plan)  was completed as per the Memorandum of Understanding (MoU) signed between Kuwait Energy and the Yemen Ministry of Oil & Minerals (MOM) in October 2010. The study was submitted to the Petroleum Exploration  and  Production  Authority  (PEPA),  Yemen  and  discussion  on  the  way  forward  is progressing. 

Page 7: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 7

2.  Reserves:  Kuwait Energy engaged Gaffney Cline & Associates (GCA), an  independent energy consulting  firm,  to undertake an audit of its year end 2010 reserves, and Fugro Robertson to estimate its year end 2010 resources.  As  at  31  December  2010,  Kuwait  Energy’s  working  interest  Proven  and  Probable  (2P) reserves  are  48.8mmboe,  working  interest  contingent  risked  resources  to  be  32mmboe  and  best estimate of  risked prospective  resources of 212mmboe.   The prospective  resource  revision  includes adjustments  for  the  Abu  Sennan  partial  divestment.  A  breakdown  of  the  reserves  and  resources  is shown in the tables below:  

 

  Notes: 1. Reserve and resource estimates are Kuwait Energy Working Interest     2. Resource Estimates are risked 3. Estimates above exclude Karim Small Fields (Oman) which is covered by a Service Agreement which 

does not allow external reporting of reserve volumes       4. YE10 reserves were prepared by Gaffney Cline & Associates (GCA) and Resource estimates by Fugro 

Robertson  5. In 2010, KEC won the bid to develop the Siba & Mansuriya fields in Iraq ‐ additional 2P WI reserves 

of 141.9mmboe will be booked once the contract is signed  

Reserves & Resources Definitions 

Reserves  and  resources  have  been  estimated  in  accordance  with  the  2007  Society  of  Petroleum Engineers  (SPE), World  Petroleum  Council  (WPC),  American  Association  of  Petroleum  Geologists (AAPG), Society of Petroleum Evaluation Engineers (SPEE) and Petroleum Resources Management System (PRMS) – commonly referred to as the SPE PRMS. 

   

Proven plus Probable Reserves (Kuwait Energy Working Interest)

Reserves year end 2009 57.91 38.61 3.13 51.20Production -1.77 -3.37 -0.06 -3.72Exploration Discoveries 0.00 0.90 0.00 0.90Acquisition/Divestments & Revisions -2.30 1.11 -0.36 0.40

Reserves year end 2010 53.84 37.26 2.71 48.77

Sales Gas(bcf)

Crude Oil(mmbbl)

Condensate(mmbbl)

Total(mmboe)

YE09 Production Exploration

Adds Revisions Acq/Divest YE10 - WI

Reserves Proven + Probable 51.20 -3.72 0.90 1.11 -0.71 48.77 35.73

Contingent Resources 2C 15.45 -------- -------- 16.50 0.00 31.95

Prospective Resources Best 235.22 -------- -------- 3.49 -26.61 212.10

= 35%

Classification Category

Kuwait Energy Reserves and Resources in mmboe

YE10 Working InterestYE10 - Net Entitlement

Proven plus Probable RRR

Page 8: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 8

3.  Production:  

Kuwait  Energy’s working  interest  share  of  production  and  the  revenue  for  the  quarter  ended  30 June 2011 compared to the quarters ending 31 March 2011 and 30 June 2010 is shown in the table below: 

Asset  Daily Average Production (boepd) 

  Q2 2011  Q1 2011  Q2 2010 

Egypt   

   BEA  323 295 551 

   Area A  4,163 4,305 4,333 

   ERQ  3,510 3,210 3,387 

Egypt Total  7,996 7,810 8,271 

Oman  2,723 2,756 2,646 

Yemen  672 695 768 

Ukraine  1,174 1,181 891 

Russia  338 543 498 

Total  12,902 12,985 13,074 

Sales Revenue (US$ million)*  46.5  41.4  36.9 

Average Oil Price** (US$ per bbl)  109.02  94.74  70.09 

Average Gas Price*** (US$ per mcf)  8.50  8.18  8.03 

 

Daily average working interest production for Q2 2011 was 12,902 barrels of oil equivalent per day  (boepd),  a  0.6%  decrease  on  the  previous  quarter.  This  decrease  was  primarily  due  to production  in  the  Luzskoye  field  in  Russia  being  shut‐in  for  40  days  while  a  new  bridge  to transport the oil was being constructed to replace the old bridge which was damaged by floods.  

 *     Sales revenue includes revenue from sale of gas and condensate from Ukraine assets and is less profit petroleum and   

is based on management accounts which are subject to audit. **     Average Oil Price excludes Karim Small Fields, Oman as it is under a Service Agreement.  ***   Average Gas Price includes Value Added Tax (VAT) 

   

Page 9: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 9

Quarterly Revenue and Production 

The  chart  below  shows  quarter‐by‐quarter  daily  average  production  (boepd)  and  revenue  from  Q1 2006 to Q2 2011:  

 

     Revenue was up 12.3% from the previous quarter due to higher realized product prices. 

Brent Crude Oil Price 

 

Source: EIA 

   

Page 10: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 10

4. Development Activity:  

Development expenditure in 2Q 2011 was US$ 17.9* million which was primarily spent on:  

Drilling development wells in Oman, Egypt and Russia.  Upgrading  surface  facilities  and  preparing  two  pads  in  Luzskoye  Field,  Russia  in 

preparation for drilling five development wells during 2011.   Well workovers in BC fields, Ukraine.  

 Country  Basin/Area  No. of 

Wells Target  KEC 

Interest Status at end Q2 2011 

Q1 2011           Oman  Karim Small Fields  8 Oil 15.0% Producers 

Q2 2011           

Oman  Karim Small Fields  8 Oil 15.0% Producers 

Oman  Karim Small Fields  1 Oil 15.0% Drilling 

Egypt Burg El Arab  1 Oil 75.0% Drilling 

East Ras Qattara  1 Oil 49.5% Drilling 

Russia  Luzskoye   1 Oil 100.0% Drilling 

*   Based on management accounts which are subject to audit.  4.1 Facilities  

Country  Facilities 

Egypt 

Area A  

Purchased an Export Production Facility for the Shukheir NW field.  

ERQ  

QPC Treatment Facility: Construction work underway for upgrading the oil separation and treatment facilities to increase capacity and reduce downtime.  

Burg El Arab 

Installed tank to increased storage capacity of BEA by an additional 500 barrels. 

Russia 

Luzskoye 

Facility upgrades focussed on infrastructure, flow assurance and increasing production capacity including main oil processing facility, well pads and tank storage. A new bridge to transport oil was also constructed to replace the old bridge. These upgrades increase processing capacity to 7,400 bopd and also facilitate a future upgrade to increase capacity to 11,000 bopd. 

Page 11: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 11

5. Exploration Activity:  Exploration expenditure in Q2 2011 was US$ 9.0* million which was primarily spent on:  

Drilling Egypt exploration wells.   Acquisition and processing of 2D and 3D seismic data in Egypt, Yemen, Ukraine, Russia and 

Latvia.   

       The table below provides the status of these wells: 

Country  Basin/ Area 

Well  Target  KEC Cost Interest 

Well Status  

2010  Carry over 

Egypt ERQ 

Shebyl‐1  Oil  49.5% Oil  discovery,  production  tested  at  600 bopd, waiting to be put online 

Yara‐1 Oil 49.5% Dry hole, P & A Abu 

Sennan  ZZ‐4  Oil  78.0% Suspended  for  testing  and  waiting  for workover rig 

Pakistan  Jherruck  Jherruck‐B‐1  Gas  40.0%  Gas  discovery,  temporarily  suspended, investigating commerciality 

Q1 2011 

Egypt  ERQ 

Karma‐1  Oil  49.5%  Dry hole, P & A Saady‐1  Oil  49.5%  Dry hole, P & A 

Shebyl‐East‐1  Oil  49.5% Oil discovery, production tested at 1500 bopd, waiting to be put online 

Q2 2011 

Egypt  Abu Sennan 

Al Ahmadi‐1X  Oil  78.0%  Rigging up 

*   Based on management accounts which are subject to audit. 

5.1 Seismic Activity:  Seismic activity during Q2 2011 is shown in the table below: 

Country  Area/Basin  Type  km/km2  Status at end Q2 2011 

Q1 & Q2 2011 

Egypt  Mesaha  2D  800 km Acquisition  of  2011  seismic  infill  program completed. Data processing ongoing. 

Yemen  Block 74  2D  267 km  Completed  interpretation and old data integration

Ukraine  NY  3D 54 km2 Completed seismic processing. Interpretation ongoing.

Russia  Luzskoye  3D 28 km2 Completed seismic acquisition, processing ongoing.

  Chikshina  3D 14 km2 Preparing for Seismic acquisition 

Latvia  License 1/2009  3D  300 km2  Acquisition  and  fast  track  processing completed, detailed processing ongoing 

Page 12: Kuwaitenergy Second Quarter 2011 Activity Report

Second Quarter 2011 Activity Report

Page 12

6. Financials: 

  Estimated Consolidated Statement of Income: Quarter on Quarter Comparison 

 

Consolidated Statement of Income 

 Actual 

US$ Million 

      Q2 2011  Q1 2011  Q2 2010 

 Revenue (Sales)   46.5  41.4  36.9 Other Income      0.7     0.0   0.3 Royalties   ‐ 2.6   ‐ 2.3  ‐2.9 Operating Cost, General & Administrative Expenses        ‐14.9  ‐16.9     ‐11.7

 Operating Cash Flow   29.7  22.2  22.6 

                

Notes:    

All financial numbers are based on management accounts and are unaudited;   Revenue is reported net of government take, in line with the common accounting practices of leading 

E&P companies listed on the London Stock Exchange.  Revenue was up 12.3% from the previous quarter due to higher realized product prices.