The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

Embed Size (px)

Citation preview

Page 1: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

The Evolution of Long-Term Stewardship at Hanford

Rick MorenMSA Director of Long-Term StewardshipMission Support Alliance

Page 2: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

2

LTS Program at a Glance

DOE LTS Program Plan

DOE RIMS Transition Procedure

MSA System Description

MSA Transition Procedure

Program Readiness Review

MSA Information Mgmt Plan

DOE RIMS Operations Procedure

2010 2011 2012 2013 2014Rev

Rev

Rev Rev Rev

Rev

Rev

Rev

Rev

Rev

Approval

Rev

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000Ac

res

Tran

sitio

ned

to LT

S

ISS ReactorsSegment 523,360 Acres

100-F Area1,149 Acres

Segment 324,483 Acres

Segment 220,080 Acres

Segment 118,161 Acres

Post Cleanup S&M Activities

Page 3: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

3

ISS Reactors• C Reactor• D Reactor• DR Reactor• N Reactor• H Reactor

Segment 5 100-F Area

Segment 2 Segment 3

Segment 1 100-B/C 100-N Area 100-IU-6 100-D/H

300 Area

2011 2012 2013 2014 2015 2016

100-K Area Segment 4 100-IU-2

C

N

D DRH

Transition Schedule

Page 4: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

4

Reactor Transition

• 6 of 9 Cocooned Reactors Transitioning to LTS

• Consolidating Reactors Under one Contractor

• Supports Closure Subcontractor Exit Strategy

• Knowledge Transfer (500+ Documents)

• Nuclear Safety

• Sets Stage for Efficiency in S&M

Page 5: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

5

“Why didn’t we think of that”?

• Collaboration with Closure Contractor and TPA

• Started in 2012 with an Idea

• Focus on Efficiency in Dealing with Structures

ISS Reactor Completed 5-year Entry/Inspection Original Inspection Schedule

CY98 CY99 CY00 CY01 CY02 CY03 CY04 CY05 CY06 CY07 CY08 CY09 CY10 CY11 CY12 CY13 CY14 CY15 CY16 CY17 CY18 CY19 CY20 CY21 CY22

105-C

105-D

105-DR

105-F

105-H

105-N

Original Inspection Schedule

CY13 CY14 CY15 CY16 CY17 CY18 CY19 CY20 CY21 CY22

LTS Revised Inspection Schedule

CY13 CY14 CY15 CY16 CY17 CY18 CY19 CY20 CY21 CY22

Page 6: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

6

Radiological Monitoring

• Post Closure Monitoring (10-CFR-835)

• Interim Closed Radiological Waste Sites

• Detail Gamma Mapping

Page 7: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

7

Partnering for Success

• Legacy Management – Early Communication– File Structure– Information Sharing– Pilot Project in Data Storage

• Hanford Partners– DOE, Contractors,

• Other Interested Parties– Tribes, State of Oregon,

HAB, Regulators

Page 8: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

8

ISS Reactors

Segment 523,360 Acres

100-F Area1,149 Acres

Segment 324,483 Acres

Segment 220,080 Acres

Segment 118,161 Acres

What’s Next?

2011 2012 2013 2014

Acre

s Tr

ansi

tione

d to

LTS

Post Cleanup S&M Activities

2015 2016 2017

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

100,000

110,000

120,000

130,000

140,000

100-K Area2,218 Acres

100-B/C Area2,851 Acres

100-N Area2,196 Acres

100-D/H Area5,016 Acres

300 Area1,742 Acres

IU2/Segment 4A12,071 Acres

IU6/Segment 4B16,890 Acres

Page 9: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

9

For Further Information Contact:

Rick Moren, PGMSA Director of Long-Term StewardshipMission Support Alliance, 1979 Snyder Ste 201, Richland, WA O: 509.376.0852M: [email protected]

Keith D. GrindstaffHanford Long-Term Stewardship (LTS) Program ManagerU.S. Department of Energy, Richland, WA O: 509-376-1774M: [email protected]

Page 10: The Evolution of Long-Term Stewardship at Hanford Rick Moren MSA Director of Long-Term Stewardship Mission Support Alliance

10

Questionshttp://www.hanford.gov/page.cfm/LongTermStewardship

BRIDGE TO THE FUTURE