CFETR 项目需解决的关键问题 关于总体设计的一些考虑

  • Upload
    vin

  • View
    202

  • Download
    16

Embed Size (px)

DESCRIPTION

CFETR 项目需解决的关键问题 关于总体设计的一些考虑. 李建刚 ([email protected]) 2013.12 四室学术报告会. 中国聚变工程实验堆 China Fusion Engineering Test Reactor (CFETR). CFETR 主机. CFETR 磁体. CFETR 核岛. CFETR 科学和技术目标. 填补 ITER 和聚变示范堆( DEMO) 之间的科学技术差距,演示连续大规模聚变能安全、稳定发电的工程可行性。 一期采取类 ITER 科学技术,目标为 20 万千瓦,实现稳定、可靠、安全、氚自持和稳态运行。 - PowerPoint PPT Presentation

Citation preview

  • CFETR([email protected])2013.12

  • China Fusion Engineering Test Reactor (CFETR)CFETRCFETRCFETR

  • CFETRITERDEMO)ITER20100

  • CFETRITERITERITERITER85% ITERITER 70%ITER400200MW400-3000ITERITER1000MWITER

  • EASTITER>90%)5-10EAST

  • burning time, 0.3-0.5 (avalability ,

  • Burning time ITER120wb, 9080wb for ramp-up, burn, 400s-3000s 30CFETR~100 wb, Ip=7-10MA 45wb for ramp-up, 55wb for burnSolutions:Nb3Al (2212HTc) CS30% higher 130wbRamp-up 10MWEC+15MWLH20% saving: 10 wb~90 wb for burn time

    Ip = 7MA, Pfu = 50-100MWRamp up: 35 wb, tsatrt-up~ 100sBurn time: 90wb, tburn > 7200s-SSOat beta N =1.5, fbt=0.25-0.5

    Ip = 10 MA, Pfu=400MWRamp-up45wb, tsatrt-up~ 150sBurn time: 75 > 5600s -SSOat beta N =2, fbt=0. 5-0.75

    5-100.3-0.5

  • Options of Core Plasma

  • ELMHaloLW RHFW HW RH CASK LW RHNBITBMHW RHVV2-31-2VW RH VW+LW14-8RH6VVB-IB-II

  • VV

  • :SSTR

  • :SSTR

  • Up to 0.3H.Zohm

  • H&CD and diagnostics

    Q~1-3, t> 2 hour-SSO Pfusion ~ 50-100 MW3~5dpaIp = 6-8MA, Bt=4.5T, BetaN=1.5-2LHCD: 4.6GHz, 15MW( 1 port) NNBI: 250keV, > 2 hours20MW ( 1 port)off-aix posibilityECRH: 170GHz, 20MW (1 R port)ICRF 30-50MHz, 30MW ITER-like (26) ( 5 up port, 5 low port, 3 M port)

    Key diagnostics16-26:SSO magneticSurface monitors (camera?) performance + controlRetension&DustBy A.Costley

  • Phase II of CFETR: DEMO validationPhase 2: AT H-mode (DT-2,6-8y)Ip=14MA Bt=5.3T, BetaN=3.0R=6.0m, a=2.0m, K=2.0, Advanced TMBQ~ 10, Pfus = 1000MW, Qeng > 1 (200MW net electricity generation)ITER-like diagnostics (26) + DEMO-magnetic.Extension DIII-D AT(10s) to EAST(1000s)Explore possibility for higher Ini ~1Explore possibility for EC (H&CD) only

    DIII-D Stationary discharges at N ~ 3.1, fNI ~ 0.8, DIII-D /EAST effortsat N ~ 3.5, fNI ~ 0.9,

  • Phase II of CFETR: DEMO validation

  • Divertor concept validationEAST- SnowflakeCFETR- SnowflakeCFETR- Super-XEAST: snowflake experiments Vs EFIT+TSC+B2, Radiation+detache CFETR: Snowflake, Super-x, Snowflake+Super-x, adding D1+D2 coilsnew concept explorationEAST 2013-2015Ptotal = 34 MW CWITER-like W divertor10MW/m2, full metal

  • TF1642,VSNBIITER,WCPF300LSN6-8ITER4ITERRH

  • CFETRITER2-3ITER20TBR2-422DEMO2-3T-system(close cycling of T90% of T from exhausting system2-3 hours for T reprocessing . 10% T from TBM6-12hTVV10g)kg/y), 100VVT-plant 30%--40%

  • CODACITERA.Costley&PFCDUST12-15ECRHITERECCD 20MWLHCD20MW 4.6GHz PAMNBI500keV off-aixICRF5-10road mapRHJET+ITER400MW

  • SummaryCFETR.ITERITERR&D.3-5R&D