Development of the Highly Durable COS Hydrolysis Catalyst
for IGCC Gas Clean-up System
Mitsubishi Heavy Industries, Ltd.Mitsubishi Heavy Industries, Ltd.Kaori Yoshida
October 31, 2012
Outline
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 1
• Update of Nakoso Demonstration Plant
• MHI IGCC System
• MHI Gas Clean-up System
• Characteristic of MHI COS Hydrolysis Catalyst
• Results of Demonstration Test
250MW IGCC Demonstration Plant (Nakoso)
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 2
Single Point Responsibility(EPC Turn-Key Contract)
METI
Clean Coal PowerR&D Co., Ltd.
30% Subsidy
Hokkaido EPCo.Tohoku EPCo.Tokyo EPCo.Chubu EPCo.Hokuriku EPCo.Kansai EPCo.Chugoku EPCo.Shikoku EPCo.Kyushu EPCo.J-PowerCRIEPI
70%Contribution
Researchers
Ministry of Economy, Trade and Industry
MHI
Joint Project Agreement
・ Power Plant Section・ Chemical SectionTokyo
Nakoso
TokyoTokyo
NakosoNakoso
Gas Clean-Up
HRSG
GT / ST
GasifierGasifier
140m
140m
250MW IGCC Demonstration Project (Nakoso)
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 3
Project execution went on Schedule. Operation started Sep. 2007 100% Load 2,000hrs. Continuous Operation completed (2008)
Various testing activities Coal Change / Load Swing /
Efficiency Improvement, etc. 5,000hrs. Durability Test completed
⇒Subsidy from METI ended
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Engineering Construction Operation
Coal Change / Load Swing / Efficiency Improvement, etc.
18,000 hrs. Operation
2007 ~ 2010
2011 ~
Targets & Achievement of Demo. Plant
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 4
Targets Achievements Note
Performance Output 250MW 250MW
Efficiency (Net, LHV) > 42.0% 42.9%
Carbon Conversion > 99.9% > 99.9%
Emission(@dry, 16%O2)
SOxNOxDust
< 8 ppm< 5 ppm< 4 mg/m3N
1.0 ppm3.4 ppm< 0.1 mg/m3N
Operational Flexibility
Coal tested BituminousSub-bituminous
Chinese, PRB3 Indonesian SubsColombian, Russian
Continuouslytesting other coals
Start-up Time < 18 hr 15 hr
Minimum Load 50% 36%
Ramping Rate 3%/min 3%/min
Reliability Long-term Continuous Operation
2,000 hr 2,238 hr
Long-term Reliability Run 5,000 hr 5,013 hr
• All of the demonstration targets have been achieved.• Future plan focuses on the further improvement of operational flexibility.
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 5
SpecificationGasifier Dry feed, Air blown, Two-Staged Entrained BedGas Clean-up MDEA (Methyl Di-Ethanol Amine)Gas Turbine MHI D-type
(1,250ºC Class)
Coal feed 1,700 t/day
Plant Efficiency 42% (LHV, Net)
Emission SOx : 8 ppmV(16% O2, dry) NOx : 5 ppmV
(w/SCR)Dust : 4 mg/m3N
MHI Supplied All the Key Components MHI Supplied All the Key Components
250MW IGCC Demonstration Plant (Nakoso)
MHI IGCC System
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 6
Steam Turbine
Gas Turbine
Slag Hopper
Gas Treatment
Compressor
Pulverizer
Hopper
石炭
変圧器
AirGasifier
Coal
HeatRecoverySteamGenerator
Transformer
SGC(Syngas Cooler)
Gasification Section
Gas Clean-up Section
Gas Clean-up Section
Combined Cycle
Section
from/to HRSG
to/fromSGC
Each Section of MHI
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 7
Gas Clean-up Section
Gas Clean-up Section
• Gasifier
Remove impurities and purify the raw syngas.
Gasification Section
Gasification Section
Combined Cycle Section
• Gas Turbine• Steam Turbine
forPower Plant
・ Impurities : H2S, COS, NH3, HCl, HCN and etc.
・ Impurities cause corrosion problem
・ Use chemical wet scrubbing to purify(ex. MDEA)
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 8
Wastewater Treatment
Sludge
SulfurProduct
Effluent
FurnaceH2S
Stripper
GGH*COS
Converter
H2SAbsorber
WashingTower
MHI Gas Clean-up System
Syngas from Gasifier
Gas Turbine Stack
COS Hydrolysis CatalystPurified
gas
Waste water
Off-gas
COS → H2S
GGH**Gas-to-gasHeat Exchanger
MDEASolvent
Sulfur Recovery System
NH4+
Cl-
COS hydrolysis reaction
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 9
COS + H2O → H2S + CO2
( COS + H2 → H2S + CO )
HCN + H2O → NH3 + CO
COS can’t be removed with amine solvent, it needs to convert to H2S with COS hydrolysis catalyst.
HCN hydrolysis reaction is also occurred at the same operating condition as COS hydrolysis catalyst.
* HCN : Deadly poison gas in gasification raw syngas
Characteristics of MHI catalyst
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 10
1. High durability against impurities in syngas
2. High COS hydrolysis performance at high temperature
3. Low pressure drop and less plugging
High durability against halogen, COS hydrolysis catalyst fit in front of halogen removal system.
Reaction temperature: 300 ºC (572 ºF)
Honey-comb shaped module
Honey-comb shaped catalyst
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 11
Low pressure drop and less plugging
・ Honey-comb shaped module
・ Many experiences of MHI SCR honey-comb shaped catalyst
・ Less plugging than pellet typed catalyst
Pilot TestPilot Test
Demonstration Test
Demonstration Test
Commercial Commercial
Evaluation by MHI 24T/D Pilot Plant
R&D has been carried out step by stepto commercialize the new catalyst
Labo. TestLabo. Test
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
History of the catalyst development
@ Hiroshima R&D Center@ Hiroshima R&D Center
(Honey-comb shaped)(Honey-comb shaped)
Scale-upScale-up
24tpd
1,700tpd
3,600tpd
Pilot TestPilot Test
Demonstration Test
Demonstration Test
Commercial Commercial Commercialize the catalyst
Testing more than 18,000 hr at Demo. Plant
Labo. TestLabo. Test
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
History of the catalyst development
Evaluation by Nakoso Demo. Plant
Gas Clean-Up
Gasifier
HRSG
GT / ST
@ Hiroshima R&D Center@ Hiroshima R&D Center
(Honey-comb shaped)(Honey-comb shaped)
Scale-upScale-up
・ Syngas from several types of coal・ Changing the load of the plant
The demo. plant is now in operation and the catalyst test still continues
1,700tpd
24tpd
3,600tpd
MHI catalyst is ready to offer for commercial IGCC plant
Results of Demo. Test (~16,000hr) @Nakoso
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 14
Stable & High Performance
Results of Demo. Test (~16,000hr) @Nakoso
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 15
• The measured value is consistent with prediction from rate equation
• High COS hydrolysis performance with 1~100 ppm halogen in syngas
• No replacement of the catalyst from 2007~present
• Syngas from several types of coals have tested
• HCN Conversion : > 99%
Comparison of Gas Clean-up System
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 16
SyngasTo GT COS
Converter
H2S Absorber
Washing Tower
Minimize heat loss(b)MHI system
572ºF300ºC
Remove dust and halogen
SyngasTo GT
Re-heating COS Converter H2S
Absorber
Washing Tower
Scrubber
(a)Conventional system
302ºF150ºCWater
wash (decrease temp.)
Waste Water Treatment
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 17
(a)Conventional (ex.)
Ca and F removal
Cyanide oxidation
Heavy metals
removalEvaporation
Chemical
Waste Water
Ozone Chemical Steam
Salt
Salt
(b)Use of MHI COS hydrolysis Catalyst
No cyanides
• Improve OPEX and CAPEX• Safe process (no cyanides)
Ca and F removal
Heavy metals
removalEvaporation
Chemical
Waste Water
SteamChemical
Summary
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 18
MHI OtherProcess ◎
Simple ComplexPressure drop ◎
Honey-comb PelletWaste water
treatment〇
No cyanidePlant efficiency ◎
Excellent〇
Good
There are many advantages of MHI Catalyst
Advantages of MHI Catalyst
Conclusion
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 19
• Nakoso IGCC demo. plant is now in operation and all of the targets have been achieved
• COS hydrolysis performance is confirmed from 18,000 hrs demonstration test
• MHI designed gas clean-up system minimizes the energy loss and provides highest reliability
MHI offers COS Hydrolysis Catalyst based on our own technology.