KNOWLEDGE MANAGEMENT OF KNOWLEDGE MANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni Teollisuuden Voima Oyj © Teollisuuden Voima Oyj LUOTTAMUKSELLINEN © Teollisuuden Voima Oyj LUOTTAMUKSELLINEN Teollisuuden Voima Oyj

KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

KNOWLEDGE MANAGEMENT OFKNOWLEDGE MANAGEMENT OF A NPP PROJECTOLKILUOTO 3 CASE

7.11.2016

Silvennoinen Jouni

Teollisuuden Voima Oyj

© Teollisuuden Voima Oyj LUOTTAMUKSELLINEN© Teollisuuden Voima Oyj LUOTTAMUKSELLINEN

Teollisuuden Voima Oyj

Page 2: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

Teollisuuden Voima Oyj and Posiva Oy- Unique Nuclear Site in Olkiluoto, Finland

OL1 and OL2 BWR’s started in early

q ,

OL1 and OL2 – BWR’s started in early 1980’s

Continuous improvement and i i k f f tuncompromising work for safety

2018 renewal of Operating License

OL3 – EPR technologygy

Testing phase ongoing, Operating License applied

Electricity production at the end of Electricity production at the end of 2018

Final disposal facility for spent nuclear fuel from R&D to constructionfuel – from R&D to construction

World first: Construction License granted

LUOTTAMUKSELLINEN© Teollisuuden Voima Oyj 2

Page 3: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

LUOTTAMUKSELLINEN© Teollisuuden Voima Oyj

Page 4: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR October 2016

Page 5: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR October 2016 – Main Control Room

LUOTTAMUKSELLINEN© Teollisuuden Voima Oyj

6

Page 6: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR April 2016 –

Operation LicensepApplication

7

Page 7: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR Project Status

• Site workforce currently about 2 400 persons

• Finalization of the main electromechanical installations and plant finishing works are underway

• NCC – Nuclear Circuit Cleaning completed

Si l t Sit A t T t l t d• Simulator Site Acceptance Test completed

• The Turbine Plant commissioning has been completed as far as possible, partly in

tipreservation

• Cold Functional Tests, summer 2017

8

Page 8: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

Knowledge Management During NPP Design and C t ti d T f i t O ti d M i tConstruction, and Transfer into Operation and Maintenance

1 2 3

Size

1

Duration

2

“Complexity”

3

X XKM

• Physical size• Nr of organisations• Amount of money

• Many years• People

change

• Integrated• FOAK• Proof of

complianceTransfer

Plant Operation and maintenance: long term reliable operation, cost-effective maintenance, safety case, etc

KM

9

Page 9: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR Project – Challenges in Plant Design Data M t d i th P j tManagement during the Project

• Data structure: databases, documents, hierarchy, distributed into several organisations

• Data quality: information content in the design data and documentation must be clear, consistent, and correct.

• Administration and management: planning and implementation of design data and document administration; metadata, data access etc

• Safety Regulations: need to prove that the design is compliant with the safety requirements, in a traceable and verifiable way

“ ” f f• “Dynamics” of plant design: design freezes, is the design mature enough to be release to downstream design steps, management of design changes (scope and impact)

• Configuration management and control

10

Page 10: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

Plant Design Data Management during the Project

”Management”• People with skills and

relevant experiencep• Processes• Safety Case and Safety

Authority interaction

Tools

Etc.Important factors:- Maturity of plant design FOAK

- Capability of the Supplierp y pp- Capability of the Owner- Safety Authority and Regulatory Environment

LUOTTAMUKSELLINEN© Teollisuuden Voima Oyj

Page 11: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

Knowledge Management During NPP Design and Construction- Licensing of Digital I&C

STUK

Conceptual Design PlanContents Correspond to PSAR +

System pre-inspection documentsContents Correspond to FSAR+

FAT Inspection SAT inspection Periodic inspection

STUK Approval of disassembly of test bay

STUK Approval of System Commissioning

Program

STUK Decision/Approval granted for Fuel Loading

For info For info For info For info For infoFor info

Safety Authority

TVO Licensing

TVO Plant Integration, Licensee review

SQAD Report 2+

SQAD Report 4-

SQAD Report

suppl. 5a

SQAD Report

suppl. 5b SQAD Report 0

SQAD Report 4/5'Owner

TVO I&C System

TVO I&C Architecture/Integration

PR-1PR-1PR-1P1 AssSys x

PR-1PR-1PR-1P2 AssSys x

PR-1PR-1PR-1P3 AssSys x

PR-1PR-1PR-1P4 AssSys x

PR-1PR-1PR-1

P5a AssSys x

P1 AssArch

P2 AssArch

P3 AssArch

P5a AssArch

P5b AssArch

P4 AssArch

PR-1PR-1PR-1

P5b AssSys xI&C Report (4):

‐I&C detailed design qualified as I&C Report (2): ‐ I&C Architecture and System basic 

AREVA Plant Integration, Designers review

PR-1 Arch PR-2 Arch PR-3 ArchPR-5b ArchPR-5a Arch

PR-4 Arch

Plant Supplier

tested ‐ Readiness for I&C into Operating License Application

ydesign qualified as specified ‐ V&V and Test coverage adequate as planned

AREVA I&C Architecture/Integration

Pre-inspection docs P1Arch

PR-1PR-1PR-1

PR-2 Sys x

PR-1PR-1PR-1

PR-1 Sys x

PR-1PR-1PR-1

PR-3 Sys x

PR-1PR-1PR-1

PR-4 Sys x

PR-1PR-1PR-1

PR-5a Sys x

Pre-inspection docs P1Sys x

Pre-inspection docs P2Sys x

Pre-inspection docs P2Arch

PR-1PR-1PR-1

PR-5b Sys xDefined Design Phases based on defined Plant design configuration

‐ Documentation and organization adequately in place for start commissioning

AREVA I&C System

I&C Phase 1 I&C Phase 2 I&C Phase 3 I&C Phase 4

PSAR Phase

I&C Phase 5b

Plant LevelRequirements

Specification and

OLA Submittal FD OLG FL PTO

OLA system/plant level doc updates

for FLOLA doc updates

RC2 RC3RC4

30 days I&C Arch I&C Arch

Sys x Sys x

Construction Phase

OLA doc updates

I&C Phase 5a

FSAR Phase

OLA system/plant level doc updates for OLG

design configuration

LUOTTAMUKSELLINEN© Teollisuuden Voima Oyj 12

Requirements Specification and Planning

I&C Phase 2Design and Specification

I&C Phase 3Detail Design and implementation

I&C Phase 4Integration and analysis Nuc Comm, Phase

C+D

Specification and planning

P&S 2.0.00

yDemo Run(Phase E)

I&C ArchPhase 1

I&C Arch Phase 2 Non-nuclear commissioning, Phase A+BInstallation

I&C Phase 5a

Page 12: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR Project – Preparation for Operation Phase

• Build adequate competencies to be able to operate and maintain the plant

• Plant Operation• Maintenance• Engineering• Safety CaseSafety Case

• How to ensure that skills and competencies are

• built and collected during construction • transferred for operation and maintenance phase

• Case System Engineers readiness self-assessment

14

Page 13: KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT …€¦ · KNOWLEDGE MANAGEMENT OFMANAGEMENT OF A NPP PROJECT OLKILUOTO 3 CASE 7.11.2016 Silvennoinen Jouni ... ”Management”

OL3 EPR Project – System Engineers

• Need to create “capability clusters” taking into account the different system groups / engineering disciplines, number of System Engineers, and the required knowledge

• System attributes: System group /engineering discipline, “required knowledge quantity” (i.e. how complex and/or difficult a system is can the work be outsourced etc)system is, can the work be outsourced, etc)

• Target is to have synergies in learning and create teams where System Engineers are bl t t b k f h thable to act as back-up for each other

17